Page 1

City Hall Renovation 2004-2005

Update #10
May 31, 2005



Work continues on City Hall with visible changes on the outside of the building. The railings are being installed on the stairs on the west side of the building. New sidewalks have been poured and a decorative stamp has been added with colored concrete. The public entrance doors on Water Street and Maple Street have been replaced with wooden doors that have been trimmed and are waiting for their final coats of stain.

 

Photographs showing the installation of the handrails on the Stairs on the West Side of the Building




The Main Maple Street entrance has had
Light Posts installed that replicate the
original ones from the early 1900's

New doors have been installed on Maple Street
 


Click photo for a larger view