This update will highlight four areas of work on the renovation of City Hall. First is the work on the exterior of the west side of the building. The retaining wall for the stairs is being installed along with the retaining wall for the parking lot. These areas are highlighted in the following photos:
New Retaining wall for Parking Area
Shows retaining wall for rear stairway
The steps on the east side of the building are being given a new foundation. It was discovered that clay under the old foundation for the steps created settling over the years. This required that new footings be poured to give a stable base that will last for another century. The steps were removed in pieces which look like large building blocks.
Work on the repair of the east stairway
Sections of stairway that will be reinstalled once the new foundation is in place/td>